Featured partner
Recommended for Harrow

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Harrow

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Land survey practice based in Harrow, West London.
Land and building surveying company with offices in Surrey (Dunsfold Park), London,…
Land survey and site engineering practice based in Chesham, north-west of the M25.
Land and measured-building survey practice with a London office in Crystal Palace.
Accurate levels on the slopes of Harrow on the Hill, along the Wealdstone Brook and in Harrow Town Centre, are why a topographical survey matters in Harrow. For planning applications the local planning authority is the London Borough of Harrow. Policy CN3 of the Local Plan 2021-2041, adopted on 24 March 2026, requires flood risk assessments to address all relevant sources including surface water, and sets finished floor levels for residential development in Flood Zone 3. A measured survey is also needed to support tree protection under Policy GI4 and layout in the Harrow on the Hill Conservation Area.
Local planning authority: London Borough of Harrow

Lowlands Recreation Ground, The Grove Open Space and the setting of St Mary's Church, Harrow on the Hill, need accurate ground levels. Sites along the Wealdstone Brook and toward the River Pinn need water edges and thresholds if a drainage strategy or finished floor level depends on them.
The London Borough of Harrow assesses flood risk and finished floor levels under Policy CN3 of the Local Plan 2021-2041, adopted on 24 March 2026, together with Policy GI4 on trees and landscaping and London Plan Policy SI 12, published on 2 March 2021. Confirm current drawing standards and any validation requirements with the council before submitting.
Local plan: Harrow Local Plan 2021-2041 (adopted 24 March 2026) and The London Plan 2021 (published 2 March 2021) (The Harrow Local Plan 2021-2041 was adopted on 24 March 2026 and is the adopted borough development plan as of 13 November 2026, together with the London Plan 2021, published on 2 March 2021. It replaces the 2012 and 2013 plan documents. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Harrow is the local planning authority and the Lead Local Flood Authority.)
GI3: Biodiversity
Requires development proposals, unless exempt under the Environment Act 2021, to contain a biodiversity plan including an appropriate net gain metric, a preliminary ecological assessment where appropriate, and an on- and off-site mitigation and management plan. Proposals must follow the mitigation hierarchy and must not result in loss of, or uncompensated harm to, irreplaceable habitats, designated sites or other important features. Unless exempt, major and minor development must be supported by a Biodiversity Net-Gain Plan demonstrating a minimum of 2 biodiversity units per hectare or a minimum net uplift of 10 per cent, whichever is greater, plus at least one wildlife enhancement per residential dwelling. Following the NPPF published on 17 August 2026, the statutory 10 per cent minimum applies except where a higher figure is justified on a specific site allocation.
GI4: Urban Greening, Landscaping and Trees
Requires a design-led approach that maximises local greening, with a presumption in favour of retaining and integrating existing trees, woodlands and hedgerows. Trees identified for retention must be protected during construction, with appropriate root protection areas. Planning permission will be refused where proposals would result in the loss of or harm to trees subject to a TPO, ancient or veteran trees or woodland, or trees categorised as suitable quality and value in a BS5837 survey. Where tree loss is unavoidable, replacement will be required at a rate of at least two new trees for each tree lost, on site where appropriate, or by a contribution for any shortfall. Major development should meet the London Plan Urban Greening Factor scores of 0.4 for predominantly residential and 0.3 for predominantly commercial development unless it is not feasible.
CN3: Reducing Flood Risk
Requires proposals to apply the sequential and exception tests in line with national policy. Where a flood risk assessment is required, it must show that the development will be resistant and resilient to all relevant sources of flooding including surface water, minimise flood risk on site, not increase flood risk elsewhere, reduce flood risk overall where possible, and provide a dry means of escape. For residential development in Flood Zone 3, finished floor levels must be at least 300 mm above the modelled 1 in 100 year plus climate change flood level. Basement development will not be allowed on sites in Flood Zone 3b, and new dwellings or additional habitable accommodation in basements will be refused. Natural flood management methods should be the preferred approach.
G6: Biodiversity and access to nature
London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.
G7: Trees and woodlands
Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.
SI 12: Flood risk management
Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.
General guidance for topographical survey, not formal advice for your site.
London Borough of Harrow. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
The slopes of Harrow on the Hill, the Wealdstone Brook and finished floor levels required by Policy CN3 all depend on accurate measured levels. A survey also supports tree protection under Policy GI4 and layout in the Harrow on the Hill Conservation Area and Harrow Town Centre.
No. Accurate levels also matter on the slopes of Harrow on the Hill and in Harrow Town Centre, particularly where surface-water flow routes, tree constraints or changes of level affect the layout.
No other published town guides for this survey in the council area yet.