Featured partner
Recommended for Barnet

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Barnet

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Civil and structural engineering practice with a London office in Lambeth.
Transport and civil engineering consultancy with a Surrey office in Godalming and a…
Transport planning and infrastructure consultancy with its main office on North Street…
Civil and structural engineering consultancy whose London office is in Sutton town centre.
Chipping Barnet sits on a ridge, so fluvial flood zones are more often an issue beside the borough's brooks than on the High Street itself, but surface water flood risk still needs a careful look on backland and basement schemes in the Chipping Barnet Conservation Area and around Barnet Church. Land falling north toward Hadley Green can also gather run-off. The London Borough of Barnet requires development to be located in areas at lowest risk of flooding from any source, not to increase flood risk elsewhere, and to manage surface water as close to its source as possible, aiming for greenfield run-off rates. A site-specific flood risk assessment is needed in the circumstances set out in Policy ECC03, including Critical Drainage Areas. Sustainable drainage should be integrated with the landscaping sought under Policy CDH07.
Local planning authority: London Borough of Barnet

The High Street around Barnet Church and the Chipping Barnet Conservation Area is not typically in a fluvial flood zone, but surface water flood risk and Critical Drainage Areas can still trigger a flood risk assessment. Run-off toward Hadley Green and down the hill should be considered in the drainage design.
The London Borough of Barnet assesses flood risk and drainage under Policy ECC03 of the Barnet Local Plan 2021–2036, adopted on 4 March 2025, read with Policy CDH07 on landscaping and SuDS and with London Plan Policies SI12 and SI13. Confirm the current local validation requirements with the council before submitting.
Local plan: Barnet Local Plan 2021–2036 (The Barnet Local Plan 2021–2036 was adopted on 4 March 2025 and is the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
CDH07: Amenity Space and Landscaping
Policy CDH07 of the Barnet Local Plan 2021–2036, adopted on 4 March 2025, requires development to provide adequate amenity space and, where hard or soft landscaping is included, to design it sympathetically to local character. Soft landscaping should provide biodiversity benefits such as habitat creation using native species, and an appropriate level of new and existing wildlife habitat including tree and shrub planting, in accordance with Policy ECC07. Existing trees of value should be retained wherever possible. Retained trees must have their stems, canopy and root systems safeguarded. Where trees are removed they should be replaced with trees of equal value and of suitable sizes and species. Where replacement on site to the value removed is not possible, a contribution to the council for any residual value may be made to provide trees in nearby streets and open spaces, secured by a planning obligation. Provision is also to be made for sustainable drainage in accordance with Policy ECC03.
ECC07: Biodiversity
Policy ECC07 requires the retention and enhancement, or the creation, of biodiversity in development proposals. It protects Sites of Special Scientific Interest, Sites of Importance for Nature Conservation, and priority habitats and species. Development is expected to make the fullest contribution to enhancing biodiversity and to protect existing site ecology, including Biodiversity Net Gain in accordance with national policy and legislation. The Environment Act 2021 requires at least 10 per cent biodiversity net gain. The policy does not set a percentage above that national minimum. Where significant harm cannot be avoided, it must be adequately mitigated or, as a last resort, compensated for; otherwise applications will be refused. Developers are also expected to take a holistic approach to biodiversity net gain, the urban greening factor and sustainable drainage.
ECC03: Water Management
Policy ECC03 requires development to be located in areas at lowest risk of flooding from any source, assessed through the sequential test at application stage, and to ensure flood risk is not increased elsewhere. A site-specific flood risk assessment is required for sites of 1 hectare or more in Flood Zone 1, for sites in Flood Zones 2 or 3, for relevant non-householder applications within specified climate-change flood extents, within an identified Critical Drainage Area, and where a site may be subject to another source of flooding and a more vulnerable use would be introduced. Surface water should be managed as close to its source as possible, aiming for greenfield run-off rates and following the London Plan drainage hierarchy, with management and maintenance plans for SuDS. Development beside a river corridor is expected to provide a buffer zone of at least 10 metres.
General guidance for flood risk and drainage assessment, not formal advice for your site.
The London Borough of Barnet. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
The London Borough of Barnet. It is also the local planning authority. The London Plan forms part of the development plan. There is no 2027 successor council for this borough.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policies SI12 and SI13 are the London Plan flood risk and sustainable drainage policies.
No other published town guides for this survey in the council area yet.