Tree surveys in Woolwich for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Royal Borough of Greenwich rules explained

Recommended For Woolwich

  1. W.J. Kent Tree Consultants Ltd

    Independent arboricultural consultancy based in Coulsdon.

  2. Landmark Trees

    London arboricultural consultancy with a trading office at Rathbone Place, Fitzrovia.

  3. Rootcause

    Independent arboricultural consultancy based in New Malden, immediately adjoining the…

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from Rootcause

Tell Rootcause about your site in Woolwich. It's free, and there's no obligation. Your request is for Rootcause only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Street trees around Beresford Square and planting in Woolwich Town Centre are a frequent reason for a tree survey in Woolwich. A planning application should record trees on and next to the site, usually to BS5837, so a layout can be designed around them. The local planning authority is the Royal Borough of Greenwich. Policy OS(f) of the Core Strategy, adopted on 30 July 2014, requires an appropriate survey of existing trees, the protection of trees and their root systems during and after construction, and suitable replacement where felling is agreed. Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan, requires trees of value to be retained where possible.

Local planning authority: Royal Borough of Greenwich

Woolwich Town Hall on Market Street, a red-brick civic building with a clock tower beside the Woolwich Centre
Photo: Kleon3, CC BY-SA 4.0

In Woolwich

Tree cover in Woolwich Town Centre, around Beresford Square, at the Royal Arsenal and on Woolwich Common is part of local character, together with the South East London Green Chain. A tree survey should be coordinated with any ecological work on those spaces and with flood or levels work close to the River Thames. Eltham, Greenwich and Plumstead are areas covered on these pages.

Local character
Woolwich Town Centre
Beresford Square
Royal Arsenal
Rivers
River Thames
Other
Woolwich Common
South East London Green Chain
Flood zones
Thames tidal floodplain
Local authority and policy

The Royal Borough of Greenwich assesses tree issues under Policy OS(f) of the Core Strategy, adopted on 30 July 2014, together with Policy G7 of the London Plan, published on 2 March 2021. A later local validation list was published in draft for consultation in 2024–25; confirm the current local validation requirements with the council before submitting, as this pack cites the adopted Core Strategy rather than that draft list.

Local plan: Royal Greenwich Local Plan: Core Strategy with Detailed Policies (The Royal Greenwich Local Plan: Core Strategy with Detailed Policies was adopted on 30 July 2014 and remains the adopted local plan. A new Local Plan is in preparation, including a draft consulted from late 2025, but that review is not treated as adopted policy. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • OS(f): Ecological Factors

    Policy OS(f) of the Core Strategy, adopted on 30 July 2014, requires development to take account of ecological factors, including an appropriate survey of existing trees, protection of trees and root systems, and surveys of flora and fauna on Sites of Importance for Nature Conservation and on sites over one hectare.

  • OS3: South East London Green Chain

    Policy OS3 promotes and enhances the South East London Green Chain, including the Green Chain Walk from the Thames through Woolwich Common toward Shooters Hill and Eltham.

  • E2: Flood Risk

    Policy E2 requires the Strategic Flood Risk Assessment to inform development, applies the sequential and exception tests, and requires flood risk assessments covering all sources of flooding, residual risk, climate change and the safeguarding of tidal and fluvial flood defences.

  • E3: Residual Flood Risk

    Policy E3 addresses residual flood risk behind the Thames tidal defences.

  • OS4: Biodiversity

    Policy OS4 requires Royal Greenwich’s rich biodiversity to be protected, restored and enhanced, with a presumption against development of SSSIs, SINCs and Local Nature Reserves. It does not set a biodiversity net gain percentage above the national minimum.

What you’ll usually need

General guidance for tree survey (bs5837), not formal advice for your site.

Timing and seasons
Can be carried out all year; leaf-on months make some assessments easier.
Standards
BS5837:2012

Questions about tree surveys in Woolwich

Who is the local planning authority for a tree survey in Woolwich?

The Royal Borough of Greenwich. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a tree survey likely in Woolwich?

Policy OS(f) requires an appropriate survey of existing trees and the protection of trees and root systems where development is proposed. Confirm the current local validation requirements with the council, as a later list has been consulted in draft.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G7 requires trees of value to be retained where possible, with adequate replacement if they are removed.